18th March, 2021

5 Best Risk Assessment Control Measures With Examples

Control measures are the things you put in place to reduce risk and prevent harm. A successful risk assessment must check existing controls, and consider if you need to do more. In this blog post, we look at the five best risk assessment control measures (with examples), and in which order you should apply them.

5 Best Risk Assessment Control Measures With Examples header image

A key question for any risk assessment is, how exactly you are going to control the risks? After all, a risk assessment isn't just a list of the risks. It's an assessment. You are assessing the risk and deciding whether or not it is safe enough to proceed.

Once you have spotted the hazards involved and calculated the risks, you now need to get those risks under control. A successful risk assessment should check the existing precautions you have in place, and then decide if you need more to prevent harm.

The things you do to reduce the risk are known as control measures. Control measures are needed in risk assessment, because what good is assessing risk if you don't reduce it? And what's the point in a risk assessment if it doesn't make the job safe?

What are control measures in risk assessment?

Control measures are the things you put in place to reduce risk and prevent harm. Control measures may include one or a mixture of:

There are lots of control measures available. If you tell your team to carry out a task wearing goggles to protect their eyes, that's a control measure. If you send staff on a training course to understand how to do something safely, that's a control measure. If you provide an item of equipment that makes the task safer, that's also a control measure.

Elimination is the best control measure you can use, to eliminate the risk from the task entirely. Of course, this is the best control measure, because you are removing the risk entirely. No risk, no danger, no chance of harm!

Now we know the best control measure, can you use this control for every risk and be the safest business in the world?

Unfortunately, it doesn't quite work like that.

While in theory, it may be possible to eliminate every risk. In practice, this would mean you and your team sitting in a padded room, away from any tools or equipment and not getting any work done. Great for safety, but not so great for your business.

What elimination is actually about, is eliminating those risks that are unnecessary. For example, working at height creates a high level of risk, so if instead, you can do the work from ground level (e.g. using extendable poles or raising and lowering equipment) then you have eliminated the risk of working at height.

What about when you can't eliminate a risk? What if the work has to get done at roof height and there is no getting around it. Enter, the hierarchy of risk control.

hierarchy of controls

The hierarchy of controls is simply a list of the best control measures, in order of priority. For example, item number 1 in the list (which should now be no surprise, it's elimination) is the best and should be considered first before moving to item number 2.

5 best risk assessment control measures

1. Elimination

We have already discussed this earlier on in this post, and elimination should always be the first control measure you consider. Ask yourself, can this risk be removed entirely from this activity?

Examples of elimination:

2. Substitution

Substitution is the second-best control measure you could use. Maybe the risk cannot be removed entirely (as is often the case), but could it be reduced by replacing the material, substance or process with something less dangerous?

Examples of substitution:

3. Engineering controls

The third option on our list is engineering controls - usually fixed temporary, or permanent controls. Engineering controls could be collective (protecting all workers eg. edge protection for work at height) or individual (protecting a single user eg. anchor points for connecting via lanyard). Give priority to measures which protect collectively over individual measures.

Examples of engineering controls:

4. Administrative controls

At number four, we have administrative controls. While this type of control is lower down in priority, it will often be an essential part of your control measures. These are the rules and systems you put in place to carry out the work safely. What are the procedures you need to do with work without anyone getting hurt?

Examples of administrative controls:

5. Personal protective clothing and equipment

Last, but not least on our list, is personal protective clothing and equipment (PPE). PPE is the last line of defence against a hazard, so while it shouldn't be your first choice when controlling risks, it can give the wearer added protection for any remaining level of risk, or if other controls fail.

Examples of PPE:

Selecting the best controls for your risk assessment

You don't have to pick just one control for each risk from the top 5. Your risk assessment will probably identify several different risks, and it is unlikely they can all get removed completely. There is often some level of residual risk remaining. If you can't eliminate risk, then often, the best way to control the risk will be through a combination of the other types of control measures. These controls help to bring the remaining risk down as low as is reasonably practicable (ALARP).

For example, you might replace a toxic chemical with one that is no longer toxic. But the new chemical might still be dangerous. You could then implement engineering controls (secure storage area, fume extraction), administrative controls (training and job rotation to limit exposure) and PPE (gloves, RPE, googles) for its use.

Remember to make sure all the controls work well together, are detailed in your risk assessment, communicated to your team, and are regularly reviewed and maintained to remain effective.

And remember while PPE is often needed and is the most visual control measure, it's the last line of defence and shouldn't be your primary control measure. Train workers in the function and limitation of each PPE item they use and make sure multiple PPE items need to work well together.


Need help writing your risk assessments? Speed up your paperwork with how to write a risk assessment in 5 minutes, and use the free blank risk assessment template to get started.

share on twitter share on facebook share on linked in share by email

This article was written by Emma at HASpod. Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.

Need Health and Safety Documents?

Search hundreds of health and safety documents ready to edit and download for your business.

Health & Safety Documents

Recent posts like this...

How To Use (And Understand) A 5x5 Risk Matrix image

How To Use (And Understand) A 5x5 Risk Matrix

The 5x5 risk matrix might be something you've seen in health and safety documents, management systems, or something you've heard referred to in safety briefings. But what is the 5x5 matrix? What do the numbers mean? And what do the colours show? Here's how to use (and understand) a 5x5 risk matrix.

Read Post
RIDDOR Reporting Timescales Explained (When To Report) image

RIDDOR Reporting Timescales Explained (When To Report)

Under RIDDOR (the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations) there are duties to report certain types of injuries, diseases and dangerous occurrences. Some will need reporting without delay, and others within 10 or 15 days. So what are the RIDDOR reporting timescales?

Read Post
What Are RAMS Documents? image

What Are RAMS Documents?

If you are asked for your RAMS, what does it mean? And why would you need a ram on your project? RAMS is a term often used in construction and it refers to two types of health and safety documents. In this blog post, we look at what RAMS documents are, and how you can create them.

Read Post

Spend less time on paperwork.
Start with the free plan today.