24th November, 2016

What CDM 2015 Information Should A Principal Designer Provide?

CDM 2015 created the role of principal designer, and under the regulations, this duty holder is responsible for managing health and safety during the pre-construction phase. What information should a principal designer provide to comply with the regulations?

What CDM 2015 Information Should A Principal Designer Provide? header image

CDM 2015 created the role of principal designer, and under the Regulations, this duty holder is responsible for managing health and safety during the pre-construction phase. What information should a principal designer provide to comply with the regulations?

Firstly, the principal designer role is about more that just supplying information, but the communication of information to other duty holders on the project is a key duty.

At the start of the project, the principal designer should provide the client with information on their skills, knowledge, training and experience, and how they will fulfil the role.

The principal designer has some big responsibilities regarding two of the three main CDM documents:

It is the principal designers role to provide advise the the client about the information required for the pre-construction information, and to provide this information to all designers, and to the principal contractor.

The principal designer will also need to structure, format, and gather the required content for the health and safety file, and provide this to the client at the end of the project.

The principal designer is responsible for coordinating health and safety information at the pre-construction phase.

Part of this responsibility will include sharing pre-construction information such as surveys, drawings, services, and any other relevant information between designers.

Information on the proposed expectations, methods of communication, circulation or information and attendance at meetings should be shared with the team throughout the pre-construction phase.

The principal designer acts as the key point of contact for sharing information between the design team.

Any issues with health and safety, remaining risks, design changes, or further information gathered will need to be responded to by the principal designer, including answering any questions or queries.

The principal designer can update the client on progress, status of information gathering and feedback on any significant health and safety issues.

During the construction phase of the project, the principal designer will have handed over the pre-construction information to the principal contractor, as well as information on what will be required for finalising the health and safety file.

The principal designer will also need to pass on information in response to any queries or questions regarding the design that may arise.

On completion, the principal designer is responsible for handing over the finished health and safety file to the client, or, if the appointment finished prior to completion, they will provide the information to the principal contractor.

share on twitter share on facebook share on linked in share by email

This article was written by Emma at HASpod. Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.

Need CDM Help?

Get CDM support on your construction projects with our free guides and support packs for all duty holders.

CDM Support

Recent posts like this...

When Are You Responsible For Subcontractors Health And Safety? image

When Are You Responsible For Subcontractors Health And Safety?

Subcontractors are used on most construction projects. And you might think that each contractor is responsible for their own health and safety - and they are. But if you use subcontractors, you have some responsibility for their health and safety too.

Read Post
Who Are The CDM 2015 Duty Holders? image

Who Are The CDM 2015 Duty Holders?

There are 5 main duty holders under CDM 2015 you need to know about. Some duty holders are appointed automatically, and some need to be appointed in writing. In this blog post, we'll look at the client, the principal designer, the principal contractor, designers, and contractors under CDM.

Read Post
CDM 2015 For Only One Contractor image

CDM 2015 For Only One Contractor

If your construction project has only one contractor, you'll still need to comply with the CDM regulations, but the rules are slightly different. There are changes to the duties of the client, the contractor, and any designers. Here's how CDM applies to a single-contractor project.

Read Post

Spend less time on paperwork.
Start with the free plan today.