19th February, 2016

Key Changes In The CDM 2015 Regulations

CDM 2015 introduced the role of principal designer, and with this new role comes new duties. What are these new duties? Here are the CDM 2015 principal designer duties explained. Principal designers have duties throughout the project, but mostly during the pre-construction phase.

Key Changes In The CDM 2015 Regulations header image

So by now, the new CDM Regulations (2015) have been in force in the UK for nearly a year, but there are still some key changes to the CDM Regulations that we are often asked about.

While the changes under CDM 2015 may not seem massive at first glance, there have been changes to the project team, required duty holders, appointment of duty holders, duties and notification.

Here are some of the key changes to the CDM regulations under CDM 2015 you and your team should know about to make sure your construction project complies.

The CDM project team.

CDM has always required certain duty holders to be appointed and carry out responsibilities and duties. CDM 2015 introduced a change to this project team.

CDM 2007

  • Client
  • CDM Coordinator (-)
  • Principal Contractor
  • Contractors
  • Designers

CDM 2015

  • Client
  • Principal Designer (+)
  • Principal Contractor
  • Contractors
  • Designers

The removal of the CDM Coordinator.

The CDM Coordinator role existed under CDM 2007, but was removed under CDM 2015.

A new role of Principal Designer has been introduced instead, with Clients and Principal Designers having additional duties, some of which used to be completed by the CDM Coordinator.

The introduction of the Principal Designer.

CDM 2015 defines the principal designer as the designer with control over the pre-construction phase of the project.

So, to meet this definition, the Principal Designer must be a designer, and also be appointed, and in control of the pre-construction phase of the project. The Principal Designer will have overall responsibility for CDM compliance during the pre-construction phase.

More information on the Principal Designer duties here: CDM 2015 principal designer duties explained

The appointment of the Principal Contractor and Principal Designer.

Under CDM 2007, the appointment of the Principal Contractor and former CDM Coordinator only needed to be made on Notifiable Projects.

Now the appointment of the Principal Contractor and Principal Designer roles needs to be made on any project with more than one contractor (including subcontractors), so most projects even small works will now require these roles.

The notification thresholds.

So the change here is so subtle on paper you may not even notice it, going from "CDM 2007: Notification required for projects lasting over 30 days or 500 person days", to "CDM 2015: Notification required for projects lasting over 30 days with 20 or more workers or 500 person days".

So before if you were over 30 days you knew you were notifiable. Now, this threshold only counts if you have 20 or more workers. This makes the 500 person days much more important but is also harder to work out. You can use our notification calculator if you need help.

The impact of notifications.

Under CDM 2007, if your project was notifiable this triggered additional 'notifiable project duties'. Under CDM 2015, the presence of more than one contractor triggers the need for additional appointments, and duties apply to all projects regardless of if they are notifiable or not.

The need for CDM documentation.

Under CDM 2007, key CDM documents such as the Pre-Construction Information, Construction Phase Plan and Health and Safety File were only required on notifiable projects.

The requirement for these documents now applies to all projects and you should certainly see the Pre-Construction Information and Construction Phase Plan on every construction project, and the Health and Safety File on any project with a Principal Designer.

share on twitter share on facebook share on linked in share by email

This article was written by Emma at HASpod. Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.

Need CDM Help?

Get CDM support on your construction projects with our free guides and support packs for all duty holders.

CDM Support

Recent posts like this...

When Are You Responsible For Subcontractors Health And Safety? image

When Are You Responsible For Subcontractors Health And Safety?

Subcontractors are used on most construction projects. And you might think that each contractor is responsible for their own health and safety - and they are. But if you use subcontractors, you have some responsibility for their health and safety too.

Read Post
Who Are The CDM 2015 Duty Holders? image

Who Are The CDM 2015 Duty Holders?

There are 5 main duty holders under CDM 2015 you need to know about. Some duty holders are appointed automatically, and some need to be appointed in writing. In this blog post, we'll look at the client, the principal designer, the principal contractor, designers, and contractors under CDM.

Read Post
CDM 2015 For Only One Contractor image

CDM 2015 For Only One Contractor

If your construction project has only one contractor, you'll still need to comply with the CDM regulations, but the rules are slightly different. There are changes to the duties of the client, the contractor, and any designers. Here's how CDM applies to a single-contractor project.

Read Post

Spend less time on paperwork.
Start with the free plan today.