6th April, 2016

Happy Birthday CDM 2015 - Quick Refresher

Today marks one year since CDM 2015 came into force for all construction projects in Great Britain. Happy Birthday CDM 2015! To mark the one year anniversary of CDM 2015, here's a quick refresher on the top CDM 2015 topics, to keep you up to speed.

Happy Birthday CDM 2015 - Quick Refresher header image

Today marks one year since CDM 2015 came into force for all construction projects in Great Britain. Happy Birthday CDM 2015!

It is also one year since we launched our CDM support service to help your projects comply with CDM 2015.

CDM 2015 applies to all construction projects, from replacing a toilet to constructing an arena. The regulations affect everyone involved in construction, at every stage, including designers, contractors, even (and especially) clients.

Here's a quick refresher on the top CDM 2015 topics, to keep you up to speed.

When does CDM 2015 apply?

CDM 2015 applies to all construction projects, regardless of the size or duration.

Who are CDM 2015 duty holders?

What is a Construction Phase Plan?

A Construction Phase Plan is a document required on ALL construction projects, outlining the project health and safety management procedures. This will be produced by the Principal Contractor, or the contractor on single contractor projects.

Who is the Principal Designer?

The Principal Designer is the designer who is in overall control of the Pre-Construction Phase of the project. Appointed by the Client (accept on domestic projects where the appointment can be automatic).

What is a notifiable project?

A notifiable project is one that needs to be notified to the HSE. All the other CDM duties will need to be complied with whether or not the project requires notification. Notifiable projects are usually projects lasting over 30 working days (with more than 20 workers) or 500 person days.

What happened to the CDM coordinator?

This role existed under CDM 2007, but has been removed under CDM 2015. CDM duty holders must now comply with CDM duties without the help of the CDM coordinator.

share on twitter share on facebook share on linked in share by email

This article was written by Emma at HASpod. Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.

Need CDM Help?

Get CDM support on your construction projects with our free guides and support packs for all duty holders.

CDM Support

Recent posts like this...

The Principal Designer Role, Duties And Responsibilities image

The Principal Designer Role, Duties And Responsibilities

CDM 2015 introduced the role of principal designer, and with this new role comes new duties and responsibilities. But who is the principal designer, and what do they do? In this post, we look at the role of the principal designer, their duties and the health and safety responsibilities under CDM.

Read Post
Who Does CDM 2015 Apply To? image

Who Does CDM 2015 Apply To?

The Construction (Design and Management) Regulations 2015 (CDM 2015) apply to all construction work, but who is responsible for complying with these regulations? Every construction project, no matter how big or small, short or long, needs to comply with CDM, and CDM applies to everyone involved.

Read Post
CDM Health And Safety File Contents (What You Should Include) image

CDM Health And Safety File Contents (What You Should Include)

The health and safety file is an important document required by the CDM regulations. Information for the health and safety file is gathered from all CDM duty holders, and it's important everyone understands what should be included. Here's a list of contents for the CDM health and safety file.

Read Post

Spend less time on paperwork.
Start with the free plan today.